SmART calculator

SIRT

Batch/Small Lab Calculator

Batch/Satellite and Small Laboratory Calculator:
Minimum personnel Required (MPR):


Days of operation FTE per day (based on minimum 2 staff) Number of staff (FTEs) required
0.00904 0


For small labs; use this calculation ONLY if it is higher than the main Calculator
For batch/satellite labs, 2 staff per day is always the minimum, but the calculation gives the actual FTE requirements
(useful if staffed from a larger main clinic).