SmART calculator
SIRTBatch/Small Lab Calculator
Other Smart Calculator Pages
Batch/Satellite and Small Laboratory Calculator:
Minimum personnel Required (MPR):
Days of operation | FTE per day (based on minimum 2 staff) | Number of staff (FTEs) required |
---|---|---|
0.00904 | 0 |
For small labs; use this calculation ONLY if it is higher than the main Calculator
For batch/satellite labs, 2 staff per day is always the minimum, but the calculation gives the actual FTE requirements
(useful if staffed from a larger main clinic).